Deliverables

For each work package (WP), a number of deliverables have been assigned that collectively will achieve the scope of the project.

WP 1

Project Coordination

WP 2

Platform requirements and data

capture

WP 3

Development of additive controller

structures

  • D1.1 - Project presentation
  • D1.2 - Project Management and Coordination Plan
  • D1.3 - Data Management Plan
  • D1.4 - Final Project Report
  • D1.5 - Intermediary Project Report
  • D2.1 - VR platform requirements
  • D2.2 - Upper body anatomy 3D scanning setup
  • D2.3 - Motion capture setup
  • D2.4 - Biomechanical profile requirements
  • D3.1 - Structural deformation analysis
  • D3.2 - Set of CAD form generating algorithms
  • D3.3 - Three representative ovoid models demonstrating actuation mechanisms
  • D3.4 - Viable controller housing designs with accompanying workflow documentation

WP 4

Mechanical properties and assembly

WP 5

Device and interface design

WP 6

Platform Implementation

  • D4.1 - A set of DfMA guidelines
  • D4.2 - Three functional prototype controller devices and the optimal assembly routine for each controller
  • D4.3 - A comprehensive verification, validation and testing plan for the devices
  • D4.4 - Test results on materials and service life window
  • D5.1 - Identify interaction paradigms
  • D5.2 - Design, manufacture and integration of electronics
  • D5.3 - Deliver control mappings and optimized software
  • D5.4 - Incorporate evaluation and feedback in controller adjustment or redesign
  • D6.1 - Platform implementation plan
  • D6.2 - PRIME-VR2 software framework
  • D6.3 - Integrated prototype demonstration
  • D6.4 - Completed PRIMEVR2 services

WP 7

Platform Evaluation and Validation

WP 8

Communication, Dissemination and Exploitation

WP 9

Ethics requirements

  • D7.1 - Personas Report
  • D7.2 - Ethical approval and protocol validation
  • D7.3 - Final testing report
  • D8.1 - Communication and dissemination plan, reports and materials
  • D8.2 - Virtual Reality HELIX
  • D8.3 - Capacity building plan and sustainability framework
  • D8.4 - Detailed report on knowledge management
  • D8.5 - Final plan based on the results
  • D9.1 - H - Requirement No. 1
  • D9.2 - POPD - Requirement No. 2